141 search results for Certificate of Occupancy
to the certificate of occupancy, the written
training program will be executed to these staff. The written,
Facility description (i.e. use/function, square footage, occupancy type,
construction type, basis, )
17
Indoor lighting systems & controls (i.e. lighting control panels, occupancy
sensors, daylight
maintenance staff is made available prior to the certificate of occupancy, the written training program, , other)
2
Facility description (i.e. use/function, square footage, occupancy type,
construction type,
Indoor lighting systems & controls (i.e. lighting control panels, occupancy
sensors, daylight
maintenance staff is made available prior to the certificate of occupancy, the written
training program, , occupancy type,
construction type, basis of design, location of major systems & equipment)
3
Project, control panels, occupancy
sensors, daylight harvesting systems)
18
Renewable energy systems (i.e
are to be used for
incidental storage. A fee shall be charged for each Certificate of Occupancy, hazardous materials unless approved by the Fire Department.
2. The use shall not allow human occupancy, . The use of the containers shall not allow human occupancy and is, therefore, exempt
from the disabled
occupied for less than five years from
its first due date, based on its
Temporary Certificate of Occupancy
or Certificate of Occupancy.
Certificate or Temporary Certificate
of
Occupancy, from
its first due date, based on its
Temporary Certificate of Occupancy
or Certificate of Occupancy.
Certificate or Temporary Certificate
of Occupancy permit number and
issue date.
12/1/2016
Certificate of
Registration pursuant to Section 91.1716 of the Building Code. A
Certificate, of equivalent size and Btu/hr (W) rating by a
contractor with a valid Certificate of Registration pursuant to Section
91.1705 of the Building Code. A Certificate of Compliance pursuant to
Section, is not adopted:
OCCUPANCY CATEGORY
The following definition is also adopted:
OCCUPANCY CATEGORY. For definition of occupancy category, see
the California Building Code, section 202.
Sec. 19. Section 95.300
for the Certificate(s) of Compliance shall submit
the Certificate(s) for registration and retention, and submitted
compliance documents for the building owner at occupancy.
For low-rise residential buildings, such information shall, at a
minimum, include copies of all Certificate of Compliance,
Certificate of Installation, and Certificate of Verification
documentation submitted.10-103(b)1
2.Operating Information: The builder shall provide the building
owner at occupancy, operating
“Certificate of Occupancy” and previous building permits showing the existing use of the
building(s), occupancy information, and number of parking spaces required and provided.
P/GI 2023-035, -guidelines under “Disabled Access”).
•
Records of Building Use
Copy of current “Certificate of Occupancy, the Department of Building and Safety (LADBS) and secure a Certificate of
Occupancy to maintain, plan drawn to scale showing all existing buildings. Indicate the uses, occupancy
and number
Sound insulation near LAX
Carpet Sound Certificate; IN/Form.10, are part of the floor-ceiling assembly must be installed and inspected before
the Certificate of Occupancy is issued and may be replaced only by other floor covering that provides the required
impact
are as follows:
1. Current Certificate of Occupancy as a Motel, Hotel, Apartment Hotel,
Transient Occupancy Residential Structure, or Hostel to qualify for the
conversion
2. Submittal Package, by a Certificate of Occupancy, existing on the date of the Interim
Motel Housing Project application, or
B, , Hotels, Apartment Hotels, Transient Occupancy Residential
Structures and Hostels as Supportive Housing, Occupancy Residential Structure, or Hostel, for use as Supportive
Housing or Transitional Housing
, equipment, use and occupancy, location, removal and demolition
of detached one- and two-family
shall be complied with before the issuance of the Certificate of Occupancy.
5. Inspection Bureau, acceptance.
4. All of the above conditions shall be complied with before the issuance of the Certificate of Occupancy.
5. Inspection Bureau shall be notified by the Mechanical Test Lab if the approval
apply:
a.
The building did not have a Certificate of Occupancy or Temporary Certificate of Occupancy
apply:
a.
The building did not have a Certificate of Occupancy or Temporary Certificate of Occupancy
a Certificate of Occupancy or Temporary Certificate of Occupancy for the entire calendar
year required
after
installation and approved by the enforcing agency prior to the issuance of a final certificate of
occupancy per Chapter 1, Division II, Section 111, or final approval where no certificate of
occupancy is issued. The inspection shall include, but not be limited to, verification that Braille
by the Department and
has a valid Certificate of Occupancy prior to approving the form.
This Information, and Certificate of
Occupancy. In such case, an architect should be hired.
2. A Use of Land permit, Other Agencies
1. All types of auto sales businesses require a Business Tax Registration Certificate
of the Certificate of Occupancy and
building permit (with plot plan) showing the legal
existing use(s, to the issuance
of a building permit, the contractor shall have the
following:
i) Certificate,
registration certificate or a newly paid receipt
for one.
B. CLEARANCES
1. Obtain all clearances, shall obtain a Certificate of Compliance from City
Planning Department.
3. Provide copies, of stories, type of occupancy, and the use for
all buildings. (106.3.2.1, R106.2)
7. Show the building
. A
Certificate of Occupancy, building permit, or other
suitable documentation may be submitted as
evidence, and not reduced. Provide a
copy of the Certificate of Occupancy and/or Building Permit
with plot plan, of
issuance of final Certificates of Occupancy;
and
ii. Zoning Administrator finds, . The Live/Work units shall be considered as a Group R-2
Division (apartment) Occupancy for the following building
code requirements:
Height/No. of Stories Sound
Occupancy Separation Occupant Load Factor
a Certificate of Occupancy or Temporary
Certificate of Occupancy for the entire calendar year required,
from its first due date, based on its Temporary Certificate of Occupancy or
Certificate of Occupancy, , based on its Temporary Certificate of Occupancy or
Certificate of Occupancy.
For each reporting, . Proof of a BOE-issued Organizational Clearance
Certificate and, where the building owner is a limited partnership, a
Supplemental Clearance Certificate must be shown.
2. The building
20 of 141 results