143 search results for Certificate of Occupancy
-per
mit-or-grading-and-certificate-of-occupancy-pc-str-app01.pdf?sfvrsn=29, or it can also, on “Application for Building Permit or Grading and
Certificate of Occupancy” (identified as “PC/STR, Adjustment,
and Certificate of Compliance will need to be dropped off and picked up at the Figueroa, report to the applicant.
TRACT MAPS, PARCEL MAPS, LOT LINE ADJUSTMENT, AND
CERTIFICATE OF COMPLIANCE, ), Lot Line Adjustment (LLA) or Certificate of Compliance
(COC):
a. Your name, telephone number
) Certificate of Workers Compensation Insurance
made out to the Contractors State License
Board.
ii, .
iv) Copy of City of Los Angeles business tax
registration certificate or a newly paid receipt, requirements of the zone. Lots divided after 7-29-
62 shall obtain a Certificate of Compliance from, of
stories, type of occupancy, and the use for all buildings.
(106.3.2.1, R106.2)
8. Show the building area, occupancy groups, uses, type of
construction, number of stories, fire zone, lot size, lot
Permit #:
Plan Check #:
PC number
Event Code:
Permit Number
Address
Printed:
Date
Contractor
Contractor
Issued
Date
City of Los Angeles - Department of Building and Safety
Last Status:
Status Date: AND CERTIFICATE OF OCCUPANCY
APPLICATION FOR BUILDING PERMIT
Commercial
Regular Plan Check
Plan Check
Issued on:
Date
Bldg-New GREEN - MANDATORY
1. TRACT LOT(s) BLOCK 2, CODE, INTEREST, AND ATTORNEY'S FEES.
I have and will maintain a certificate of consent to self insure
within
five days after the expiration of the Certificate of Occupancy. Requests for inspection
must be received by the department at least two days prior to public use or occupancy.
Sec. 4. Subsection, be deferred until June 1,
1995, and a temporary Certificate of Occupancy may issue for the new, or occupancy load by more than 5 percent;
7.
Any project for an existing building which will not result, as follows:
The certified licensed contractor has a valid Certificate of Registration
obtained
shall be approved by both departments prior to the temporary certificate of
occupancy (TCO).
Owner, all
parties involved, and expedite the occupancy of the buildings.
II.
GENERAL
1) Scope
installation and approved by the enforcing agency
prior to the issuance of a final certificate of occupancy per Chapter 1, Division II, Section 111, or final approval
City of Los Angeles
Department, /DAD/Corr.Lst.02 – based on 2020 LABC (Rev. 1/1/20) Page 3 of 6 www.ladbs.org
where no certificate of occupancy is issued. The inspection shall include, but not be limited to, verification
and approved by the enforcing agency
prior to the issuance of a final certificate of occupancy per Chapter 1, Division II, Section 111, or final approval
where no certificate of occupancy is issued
construction phase
¾ Issuance of Final Certificate of Occupancy by LADBS
Seismic Risk Reduction
. Description detailing scope of all work
c. Occupancy group(s) and type of construction
d. Gross area, , and attached to plans
2. CF-GR and Insulation Certificate attached to plans
3. Performance Analysis and Back
flexibility and timely distribution of
information to the public.
Page 3 of 6
c. Occupancy group(s,
2. CF-GR and Insulation Certificate attached to plans
3. Performance Analysis and Back-up forms
to be completed prior to the issuance
of a certificate of occupancy, (ex. landscaping or public, Environmental Quality Act
C of C Certificate of Compliance
PPB Project Planning Bureau, conditions
Yard Case (YC), Parcel Map Exemption (PMEX), Certificate of Compliance (COC),
Private,
4. CERTIFICATE OF COMPLIANCE
Certificate of Compliance clearance is required for:
Lot, for:
Change of Use or Occupancy when there is an increase in sewer discharge (i.e. change
of use
CERTIFICATE OF OCCUPANCY ADDITIONAL FEES
Sec. 12. Section 91.700 of the Los Angeles Municipal Code, in this structure and it shall be
equipped with permanent ventilation as required for Group S-1 Occupancy, :
ITEMS ADDITIONAL FEE
A Occupancy
$65.00 each assembly room or area
E Occupancy
$65.00 each classroom
I Occupancy
$65.00 each floor or portion thereof
H Occupancy
$65.00 each floor or portion thereof
B, F, L, M or S Occupancy
$65.00 each floor or portion thereof
R1, R2, R3.1 or R4
________________________________________
3. Provide a copy of the Certificate of Occupancy
and/or building permit with plot plan, , the contractor
shall have the following:
1) Notarized letter of authorization for agents.
2) Certificate, certificate or a newly paid
receipt for one.
B. CLEARANCES
1. Obtain all clearances as noted,
7-29-62 shall obtain a Certificate of Compliance
from City Planning Department. Allow months, ))
4) Provide copies of existing building permits and
certificate of occupancies to show compliance
(________________________________________)
4. Provide a copy of the Certificate of Occupancy, Angeles business tax
registration certificate or a newly paid
receipt for one.
B. CLEARANCES
1, of the Zone. Lot divided after
7-29-62 shall obtain a Certificate of Compliance
from City Planning, of existing building
permits and certificate of occupancies to
show compliance to following,
occupancy, upon the owners application for
a permit for alterations, repairs, or additions,
exceeding
in Section 6 C below. A certificate of
occupancy, building permit, or other suitable documentation may, or
observed yards changed on or after July 1, 1974, as evidenced by a valid
certificate of occupancy.
(1) Floor Area. Existing floor area exceeding that permitted by the
zone, height district, years have elapsed since the date of issuance of final
certificates of occupancy; and
(2
to a specific occupancy.
1.Establishthetypeofoccupancy.
2.Ve r i f, .
3.Oncetheappropriateagencyhasbeenidentified,find the chapter which covers the established occupancy.
4.TheMatrixAdoptionTa b l, Dwellings; and
Permanent Structures in Mobilehome &
Special Occupancy Parks
(916) 445-3338
Factory,
usedtoestablishwhichprovisionsofthiscodeareapplicableto
a specific occupancy:
1.Establishthetypeofoccupancy., occupancy.
4.TheMatrixAdoptionTablesatthebeginningofChap-
ters4and5identifythemandatorygreenbuildingmea
lacitysan.org/permits for more information on how to obtain a building permit or certificate of occupancy
clearance for Low Impact Development or Industrial Waste Management.
Industrial Waste
( ) paved
parking spaces per latest Certificate of Occupancy or latest
permit on record noting, :
a. Certificate of Worker’s Compensation Insurance made
out to the Contractors State License Board.
b. Notarized, of City of Los Angeles business tax registration
certificate or newly paid receipt for one.
7
. Provide ( ) paved
parking spaces per latest Certificate of Occupancy or latest
permit on record, :
a. Certificate of Worker’s Compensation Insurance made
out to the Contractors State License Board.
b, .
d. Copy of City of Los Angeles business tax registration
certificate or newly paid receipt for one
cover. Rainwater sumps serving "public use" occupancy buildings shall be
provided with dual pumps, a subsequent occupancy requires a system with a greater
capability, it shall be the responsibility of the occupant and/or owner to upgrade
the system to the required density for the new occupancy, occupancy shall not be less than that required for Ordinary
Hazard Group 2 with a design area of not less than 3,000 square feet (279 m
2
)
TABLE NO. 5.1
HAZARD CLASSIFICATION
OCCUPANCY OF BUILDING
20 of 143 results